Weekend break
The pads have been installed in the pend wall. They will receive the beams that will support the steel frame we're installing in place of the wall.

This picture was taken last night before that happened, but it gives a good impression of how the building looks at this point of maximum chaos. Everything that follows in this area will be reinstatement and refurbishment.
0 Comments:
Post a Comment
<< Home