Nu-metal
After a brief delay for checks by the structural engineer, the blacksmiths returned yesterday. Four new beams have been installed.
They'll be back today to continue installing the steelwork. I was hoping to set up a semi-live webcam in the function room, but the range of wireless networks is not good if there's anything resembling a wall between the base station and the computer.
Maybe I'll try anyway.
In all this free time I have:-(
0 Comments:
Post a Comment
<< Home